| Type of Interruption/Affected Area(s): | Nature of Interruption/Project: | Date: | Time: |
| Complete access interruption of walkway: at Law Building, sidewalk will be blocked off with fencing at both ends of courtyard and across street frontage (Bancroft Way). | Construction of new building for Law School. Structure will be built in courtyard facing Bancroft. | October 21, 2008-December 31, 2010 | Continuous |
| Partial access interruption of roadway: Centennial Drive vault repair. | Repair frame and lid of existing Communications Vault in traffic lane (Centennial Drive). | October 19-December 9, 2009 | 7:00am-5:00pm |
| Complete access interruption of roadway, walkway and parking: Area SC 28, top of stairs from Bancroft to the road between Hearst Gym and Hearst Field Annex Bldg. B - work in this area will require closure of the concrete steps for 1-2 days. SC 29, entry to driveway between Parking Structure B and Kroeber Hall - work in this area will require closure of the driveway for 1-2 days. | Area SC 28: demo of existing paving and replacement with new paving. Area SC 29: removal of non-functional bollard bases and replacement with grout fill. | November 23-25, 2009 | 7:30am-5:00pm |
| Partial access interruption of roadway, walkway and other: (W of Stephens, E of Moses, SW of Moffitt, SW corner of Etcheverry, N of Hearst Gym, E of Kroeber at bike racks, SW of McLaughlin, between Kroeber and Wurster) construction at each location will be 1-3 days, weather permitting. | Miscellaneous hazard removal, renovation of existing paving, replacement of drain grate, etc. | November 23-December 11, 2009 | 7:30am-5:00pm |
| Partial and complete access interruption of roadway, walkway and parking. Partial regarding of parking strip, street, sidewalk northwest of Cheit Hall. | Path of travel accessibility improvement associated with Koret Classroom Renovation project. | November 23-December 11, 2009 | 6:00am-3:00pm |
| Partial access interruption of walkway: project area surrounding Sather Tower. | Removal and installation of seven Campanile trees. | November 23-December 15, 2009 | 7:00am-5:00pm |
| Partial access interruption of walkway: Sather Gate. Pedestrian and emergency traffic will be accommodated. | Inspect light globes for replacement. JLG will setup once on each side with construction fencing. | November 24, 2009 | 7:00am-12:00pm |
| Partial access interruption of roadway and parking: northwest corner of Mulford Hall and requires use of Hilgard Way through the parking lot at the north side of Mulford Hall. Note that flagger will follow each truck from the intersection of Hilgard Way and the West Circle up through the north Mulford parking lot, and will ensure safe turn-around and backing up to the construction site gate at the northwest corner of Mulford Hall. | To allow for placement of concreate at the Li Ka Shing construction site. The concrete truck will be located adjacent to the northwest corner of Mulford Hall. | November 24, 2009 | 7:00am-4:00pm |
| Partial access interruption of roadway and parking: Centennial Drive south of the Strawberry Gate to LBNL and into the Botanical Garden parking lot. | To drill four bore holes to investigate geology under Centennial Drive. | December 1, 2009 | 9:30am-4:00pm |
| Partial access interruption of roadway: eastbound lane of the GPB Garage entrance adjacent to the NAF entrance. Note: there will be flaggers present for garage entrance traffic control. | To allow for a Li Ka-Shing Center concrete pour on the NAF roof at street level, which requires a concrete pump to be located within the eastbound lane of the GPB Garage entrance. | December 1, 2009 | 8:00am-4:00pm |
This page last updated on 11/24/2009. (dll)